Note to Readers
This week’s issue comes to us from Dubai, and is written by a friend of The Compute, Yasin Kasirga, founder of Qasirga Advisory and an energy executive who has spent more than 20 years building power plants: 11 GW of them across Europe, the Middle East and Africa, most recently as head of GE Vernova’s decarbonisation business in the region. He was a senior energy adviser to the COP28 Presidency, and his book, Megawatts, Not Tokens, came out last month. Over to you, Yasin.
Wirelessly,
Ziad
In The Compute Issue XVII “Thirty Trillion, All the Way Down” Ziad wrote that “the power, the grid connections and the copper below the ground carry numbers of their own”. One of them is the Compute Heat Rate (CHR), and it answers a question this newsletter has been circling for months: how much can an AI data center pay for electricity before its economics break? Hans Royal, the independent researcher who devised it, publishes the CHR every quarter, and Andy Lubershane, head of research at the energy investor Energy Impact Partners, put it in front of the power industry last month in his newsletter Steel For Fuel. I have spent my career on the other side of the meter, building the plants that sell the megawatt-hour (MWh). Here is what the number looks like from that side.
How a power plant is judged
Every power plant that burns fuel is judged by one number: how much fuel energy goes in for each unit of electricity that comes out. In our industry, we call it the “heat rate”, and lower is better.
Put 100 units of gas energy into a simple cycle gas turbine and about 36 units come out as electricity; the rest leaves through the exhaust as heat. A combined cycle plant catches that exhaust heat, turns it into steam and drives a second turbine with it, so about 60 units come out. In industry units that is a heat rate of roughly 9,500 British thermal units (Btu) per kilowatt-hour (kWh) for the simple cycle turbine and roughly 5,700 for the combined cycle plant.
For as long as I have been in this business, the buyer wanted the machine with the lowest heat rate, because fuel was the biggest cost. The most efficient machine burns the least gas per megawatt-hour, so it is also the machine with the lowest emissions. Efficiency did not remove emissions, but it kept them as low as fuel-based generation could go. The business model and the climate pulled in the same direction without anyone asking.
The heat rate, turned around
Mr Royal took the same idea and turned it around. A power plant turns fuel into electricity. An AI data center turns electricity into compute, compute into tokens, and tokens into revenue. He followed that chain backwards and asked how much the data center can pay for electricity and still cover everything else: the chips, the building, the people and a return on the capital. The answer is one number in dollars per megawatt-hour. It is not a forecast of the electricity price; it is the highest electricity price the business can survive.
Mr Royal’s Q3 2026 index, published on September 1, 2026, puts that number at $12,790 per MWh for frontier inference (the top models sold through application programming interfaces, or APIs) and at $5,631 blended across six types of AI work, weighted by electricity use. For the sake of comparison, the US industry sector pays about $90 per MWh on average, and his reference price for gas power is $50.
This means that a frontier model can pay (now hold your breath…) 142 times what the factory next door pays for the same megawatt-hour and still make money.
A buyer who does not react
The index gives a second number, the dispatch CHR, or CHR-D. The first CHR answers: at what electricity price does it stop making sense to build the next data center? CHR-D answers a different question: once the data center is built and its chips are paid for, how high would the electricity price have to go before switching it off for an hour saves money? Because that capital is already spent, the second threshold is higher: $9,071 per MWh blended, $18,378 for frontier inference.
This is the part I want everyone in the power business to see. Every large electricity user we know, a steel mill, a chemical plant, an aluminum smelter, reacts to price, because electricity is one of its largest operating costs, and that reaction, cutting back when prices spike, is what keeps a power market in balance. An AI data center does not react. No price that any electricity market has ever produced comes close to its threshold, so it runs every hour of the year whatever the price. A grid operator that wants it to cut back when the grid is tight has to write that into the tariff or the connection agreement, because the market price will never make it happen.
The link that breaks
The same arithmetic breaks the link between efficiency and emissions. For a buyer who can pay $12,790 per MWh, the difference between a 36 percent machine and a 60 percent machine is not worth a week of waiting. So the buyer takes the machine that can be delivered first, and that is usually the less efficient one. This is what is going on under the name “speed to power”. For the first time, the buyer of a power plant has no reason to care about the heat rate, and in this business model emissions have no price either, so the cost of the extra carbon falls on everyone outside the deal.
Take a 1 gigawatt (GW) campus that builds its own gas generation behind the meter (on its own site rather than through the grid) and runs it as base load, 90 percent of the hours in a year. That is about 7.9 terawatt-hours (TWh) of electricity a year, and about 4.0 million tons of CO2 from simple cycle gas turbines, 3.4 million from gas engines or 2.4 million from a combined cycle plant.
At a European carbon price of around €80 a ton, the simple cycle case costs about €320m a year, or about €40 per MWh: a fraction of one percent of the $12,790 tolerance, and about 4 percent of the $7.9bn it costs to run a gigawatt of AI capacity for a year. Even at the European carbon price, the business model would barely notice. At the US Environmental Protection Agency’s (EPA) estimate of what a ton of CO2 costs society, $190, the simple cycle case is about $750m a year.
Who carries that carbon depends on who owns the plant and who buys the power. A grid-connected campus: Scope 1 of the plant, Scope 2 of the data center. A plant behind the meter: Scope 1 of whoever owns it. The model company renting the racks and the API customer buying the tokens: Scope 3. And the lender and the investor: Scope 3, Category 15, financed emissions under the PCAF standard, in proportion to their share of debt and equity. Whoever funds it, carries it.
A number set by a price list
The Q2 blended CHR was about $8,000 and Q3 is $5,631, a fall of 30 percent in one quarter. If it kept falling at that speed, the tolerance would meet today’s industrial tariff in about three years. I ran that arithmetic because I wanted to see it, and I do not believe it. Part of the drop is a correction in method: Q3 counts the electricity of the whole server system with cooling, 13.26 kilowatts (kW), instead of the graphics processing unit (GPU) alone, 7.28 kW. Almost twice the electricity for the same tokens means almost half the revenue per MWh, but that is a one-off change in how the index counts, not a trend.
Beyond the correction, two forces pull against each other: token prices fall, which pushes the CHR down, while each new generation of chips makes more tokens from the same MWh, which pushes it up. Cheaper tokens also mean more of them: in Issue XVII Ziad cited Bain’s finding that token costs halved in 2025 while consumption grew four and a half times, the Jevons paradox at work, named after the economist who noticed in 1865 that more efficient steam engines raised Britain’s coal consumption. A lower CHR per megawatt-hour can still mean more megawatt-hours. Frontier prices are holding; Mr Royal writes, in Mr Lubershane’s piece, that frontier pricing “has remained quite high” compared to Grok and the open-weight models from China. So the direction is down and the speed is unknown. A turbine’s heat rate is fixed for the life of the machine. The compute heat rate is set again every quarter by what AI companies charge for their tokens. A 20-year power contract signed today should not assume the CHR will stay where it is.
Written in on Day 1
For the behind the meter campus, the market will not protect emissions. There is not even a push to pick the most efficient solution to start with, so the permit and the contract have to. Four things I would write into the site’s air permit and its power contract:
A limit on running hours for the least efficient units. The campus runs 24/7, the simple cycle turbine does not have to. Air permits already cap peaking units (plants built to run only in the few hours of highest demand) at a few thousand hours a year. The same cap turns a simple cycle unit into a bridge and moves its hours to the combined cycle block or the grid connection by a set date.
Space on the site plan for the heat recovery equipment that turns a simple cycle unit’s exhaust into extra power, plus water and a grid connection, so the unit can become a combined cycle plant later. If nothing is reserved on the site plan, the plant was never meant to be temporary.
A decarbonization plan for the site, announced publicly.
Reporting per site: energy, water and carbon for every million tokens.
All four are Day 1 decisions, made in the permit and the site plan before the first machine is ordered.
Back to the thirty trillion
In my book Megawatts, Not Tokens I priced one gigawatt of AI capacity at about $7.9bn a year: chips, network and building close to $7bn, staff and overhead about $0.3bn, electricity about $0.6bn. Electricity is the smallest line and the only one that cannot be bought later. That is why a company with a perfect balance sheet acts like a company in an emergency when it cannot get megawatts. Mr Royal’s index shows the same table from the other side: how far that small line could grow before the machine stops making money.
Now back to the thirty trillion: in his own arithmetic, Ziad estimates it would need about 5.4 million Nvidia GB300 racks. At around 135 kW each, that is roughly 730 GW running around the clock. Powered by simple cycle turbines, it would emit about 2.9 billion tons of CO2 a year, close to 60 percent of the energy-related CO2 the United States emitted in 2025; even with combined cycle, about 1.75 billion tons.
As of today we can only see the emissions of some of the publicly listed players, and their latest reports all moved by double digits from 2024 to 2025: Amazon up 16 percent, Google up 18 percent, Microsoft up 25 percent, each one pointing at data center growth. The rest, model companies and data center developers alike, are racing to go public. We will see the real emissions picture only when they publish their first sustainability reports, and on that day we will also see the real carbon footprint of the model you use. Brace for impact and buckle up! It would not surprise me if a model’s carbon footprint soon became a real decision parameter for the end user, next to price and quality. That is exactly why I say: “Responsible AI starts with Responsible Build.”
Yasin Kasirga
Guest Contributor, The Compute
Yasin Kasirga is an energy executive based in Dubai and the founder and managing director of Qasirga Advisory. He has developed and delivered 11 GW of energy projects across Europe, the Middle East and Africa, most recently leading the decarbonization business at GE Vernova for the Middle East and Africa, and served as a senior energy advisor to the COP28 Presidency. His book, Megawatts, Not Tokens: AI, Energy and Sustainability, was published in September 2026.
Wirelessly yours,
Ziad Matar
Co-founder, Tokenando
Editor-in-chief, The Compute
After Hours
I wrote this one from bed. A flu took the week I had planned for it, which is a reminder that the most reliable machine in any system is still the one that needs rest. Thank you, Ziad, for the patience and of course for the opportunity to guest write on The Compute.
References
Ziad Matar, “Thirty Trillion, All the Way Down”, The Compute, Issue XVII, August 28, 2026. https://tokenandoai.substack.com/p/thirty-trillion-all-the-way-down
Andy Lubershane, “For AI, energy is nothing, and energy is everything (reprise)”, with a guest section by Hans Royal, Steel For Fuel, September 21, 2026.
Hans Royal, “CHR Reference Values, Q3 2026”, Compute Heat Rate Index, September 1, 2026. https://computeheatrate.com/chr-index
Hans Royal, “The Compute Heat Rate: Quantifying AI-Driven Electricity Price Tolerance and Its Implications for Wholesale Market Repricing”, SSRN working paper, February 28, 2026, revised June 4, 2026. https://dx.doi.org/10.2139/ssrn.6322318
US EPA, natural gas emission factor 53.06 kg CO2 per MMBtu; social cost of carbon $190 per ton (2023 update).
Google Environmental Report 2026, Microsoft 2026 Environmental Sustainability Report, Amazon 2025 Sustainability Report, year-over-year emissions as cited in Megawatts, Not Tokens, chapter 12. https://yasinkasirga.com/books/sources
Yasin Kasirga, Megawatts, Not Tokens: AI, Energy and Sustainability (2026).



The Compute Heat Rate framing explains why the energy price rarely decides these projects. Across the PJM footprint, the 2026 all-sector average retail rate is about 12.78 cents/kWh, roughly $128/MWh, a small fraction of the $5,631/MWh blended figure you cite (DC Hub (dchub.cloud), as of Oct 15, 2026). The binding constraint is delivery: PJM still has about 134.9 GW of active generation requests waiting in its queue, which is why buyers end up taking whatever turbines can arrive first.